Mudjacking Process.png

1. Pattern of 1 -1 1/2" holes are drilled through sunken slab. 

2. Grout mixture made of Crushed Limestone and Portland Cement is pumped under the slab raising it to the desired height. 

3. The holes are patched with cement.